Any project which involves an EPC contract is also likely to involve a number of other complicated contracts. The challenge of the parties to an EPC contract is not to try to eliminate risk but rather put into place a narrative structure that enables the parties to predict the contractual result that would obtain if a risk materializes. If the EPC contract does not allow the parties to determine the consequences of an unanticipated situation, they will have to look to an expert, mediator, tribunal, or court to impart guidance or pass judgment. The sample forms of contract contained in Volume 2 of Understanding and Negotiating EPC Contracts are intended to serve as a guide to demonstrate how risks and responsibilities can be allocated among project sponsors, EPC contractors and the various other parties that may be involved in a project. Collectively the sample forms in this volume offer an extraordinary resource that provides the benefit of lessons learned and priceless insight into any project being undertaken which can help assure the resilience of any EPC project.... technical specification 3 ____ ____ ____ percent Order of all steam and combination turbine generators units Unpriced Subcontract, submission of boiler drawings, boiler material selection and temperature charts calculation notes 4 ____ ____ ____ percent Order of main pressure parts materials including drum and boiler pressure part basic design package Piping and instrumentation diagrams and layout drawings, general arrangement drawings and elevational drawings of boileranbsp;...
Title | : | Understanding and Negotiating EPC Contracts, Volume 2 |
Author | : | Howard M. Steinberg |
Publisher | : | Routledge - 2016-10-14 |
You must register with us as either a Registered User before you can Download this Book. You'll be greeted by a simple sign-up page.
Once you have finished the sign-up process, you will be redirected to your download Book page.
How it works: